Name: Resource Number
|
Alias
|
Description: A unique number to identify the resource used for a project. The primary key for the Resource Master file.
|
Element Characteristics
| Data Format: Numeric Type of Data: Base Default Value:
Length: 6
| Decimal Places: Input Format: 9(6) Output Format: 9(6) Validation Criteria | Continuous | Upper Limit: Lower Limit: Discrete | Value/Meaning
Comments: The Resource Number has the format: TNNNNN, where: | T represents the type of resource. 1 = Personnel, 2 = Plant and 3 = Equipment. NNNNN is a sequentially assigned number. | ||||||